Permit Submission
Fri, Aug 3, 2018We submitted our build permit application today!
This was a bit of a process. The county requires the structural drawings to be wet-stamped, which means I have to get them printed (I don’t have a big printer), then drive them to the engineer to have him stamp and sign each page.
It’s all done and mailed now!
The county still says they are 6-8 weeks turn around. Our engineer says they are likely to come back with one request for revisions too. Depending on when the final permit is issued, we will likely wait to do any concrete work until the spring.
Next Post > > < < Previous Post